Projects
31.01.2019
INVITATION for expressions of interest for the provision of
The Republic of Tajikistan has applied for a grant financing with the Asian Development Bank (ADB) for the implementation of Reconnection to the Central Asian Power System Project and intends to apply part of the proceeds of this grant to pay for consulting services in project implementation period. The project consists of the following components:
28.01.2019
Asian Development Bank will be connected the Tajik Power Network with Energy Power Grid of Central Asia. It will help to republic sell their excess energy.
In November 23, 2018 between Government of Tajikistan and ADB was signed the Grant Agreement in the amount of $35 million, which will be directed to complete reconnection of electric-power system of Tajikistan with Power Network of Uzbekistan. This implies that from 2009 year the reconstruction of the parallel operations of tajik energy system was disconnected in some region.
05.05.2017
Golovnaya 240 MW HPP Rehabilitation Project
Lot 2: Rehabilitation Works of Switchyards of Golovnaya Hydropower Plant
Results of International Competitive Bidding for Plant Design, Supply and Install
18.04.2017
Request for expressions of interest consultant services –financial audit
The Republic of Tajikistan has received financing from the Islamic Development Bank toward the cost of the Reconstruction of Ravshan Electricity Substation project and intends to apply part of the proceeds for consultant services. The services include Audit of Project’s Financial Statement and preparation of its Report. Please refer to the General Procurement Notice for this project that appeared in Jumhuriat Newspaper under No. 75, dated 29 April 2014 and 20 May 2014.
31.10.2016
Wholesale Metering and Transmission Reinforcement Project
ADB Grant 0417-TAJ: Wholesale Metering and Transmission Reinforcement Project
Lot 1: “Replacement of electricity meters, replacement of several current transformers, replacement of several voltage transformers, Introduction of an advanced metering infrastructure and introduction of a settlement system”
Procurement Method: ADB Single-Stage, Two Envelope Bidding Procedure
31.10.2016
Rehabilitation Works for Generation Units of Golovnaya HPP
ADB Grant 0376-TAJ: Golovnaya 240 MW HPP Rehabilitation Project
Lot 1: Rehabilitation Works for Generation Units of Golovnaya HPP
Results of International Competitive Bidding for Plant Design, Supply and Install
Procurement Method: ADB Two Stage Bidding Process
02.06.2016
Golovnaya 240 MW Hydropower Plant Rehabilitation Project
The Open Joint Stock Holding Company “Barqi Tojik” (“the Employer”) invites sealed bids from eligible bidders for the construction and completion of Rehabilitation Works of Switchyards of Golovnaya Hydropower Plant (“the Facilities”).
25.11.2015
Wholesale Metering and Transmission Reinforcement Project.
The Republic of Tajikistan has received financing (grant) from the Asian Development Bank (ADB) towards the cost Wholesale Metering and Transmission Reinforcement Project.Parts of this financing will be used for payments under the contract for Replacement of electricity meters, replacement of several current transformers, replacement of several voltage transformers, introduction of an advanced metering infrastructure, and introduction of a settlement system.Bidding is open to all bidders from eligible source countries of the ADB.
11.06.2015
INVITATION FOR BIDS
Grant No. and Title: ADB Grant 0417- TAJ; Wholesale Metering and Transmission Reinforcement Project
Contract No. and Title: ADB Grant 0417-TAJ/BT/ICB- Lot 2«Rehabilitation of Substation Rudaki, Extension of Substation Ayni and Construction of New 220 kV OHL between SS Ayni 220 kV and SS Rudaki.
Deadline for Submission of Bids: 11 August 2015, 10:00 am local time in Dushanbe.
The State Establishment “Project Management Unit for Electro-Energy Sector” intends to prequalify contractors and/or firms for the above lot.
Invitation
Invitation
for expressions of interest for the provision of
Project Number 47017-003: Wholesale Metering and Transmission Reinforcement Project
Новости 81 - 91 of 91
First | << | 1 2 3 4 5 | >> | Last