Sarband HPP
Sarband HPP
Included in the structural unit of "Cascade Vakhsh HPP".
Sarband HPP has been constructed in 1962 on the Vakhsh river cascade in urban-type settlement of Sarband located in Khatlon region.
Distance from river outlet to waterworks
facility 171 km
Installed capability 240 MW
Reservoir type Channel basin
Streamflow control type Daily
Director - Kholnazarov Nurmahmad Dustovich
Tel .: (+ 992-32-50) 295-350; 6-21-20; 99-333-151
Year: 1962
Aggregates: 3х35 MW / 3х45 MW
Total installed capacity: 240 MW