Размер шрифта: A A A
Цвет сайта: A A A A

Sarband HPP

Sarband HPP

Included in the structural unit of "Cascade Vakhsh HPP".

Sarband HPP has been constructed in 1962 on the Vakhsh river cascade in urban-type settlement of Sarband located in Khat­lon region.

Distance from river outlet to waterworks

facility 171 km

Installed capability 240 MW

Reservoir type Channel basin

Streamflow control type Daily

Director - Kholnazarov Nurmahmad Dustovich

Tel .: (+ 992-32-50) 295-350; 6-21-20; 99-333-151 


Year:  1962
Aggregates:  3х35 MW / 3х45 MW
Total installed capacity:  240 MW

Back to the list