04.10.2018 EVALUATION OF FIXED ASSETS AND INVENTORY FOR OSHC “BARQI TOJIK”
Open Stock Holding Company “Barqi Tojik” (BT) – is a state-owned power utility of the Republic of Tajikistan has received financing from the International Development Association (IDA) and Asian Infrastructure Investment Bank (AIIB) under the Nurek Hydropower Rehabilitation Project, Phase I to rehabilitate and ensure stability of Nurek HPP and safety of its dam and intends to apply part of the proceeds of this financing to eligible payments under the contract with a Consulting firm, which shall provide the consulting services for: Evaluation of Fixed Assets and Inventory for OSHC “Barqi Tojik”

25.09.2018 SPECIFIC PROCUREMENT NOTICE FOR SUPPLY OF VEHICLES

The OSHC “Barqi Tojik” has received financing from the International Development Association (IDA) and Asian Infrastructure Investment Bank (AIIB) under the Nurek Hydropower Rehabilitation Project, Phase I to rehabilitate and ensure stability of Nurek HPP and safety of its dam and intends to use part of this proceeds for procurement of 2 four wheel drive vehicles

01.06.2018 Nurek Hydropower Rehabilitation Phase 1 (deadline until 08.06.2018)

Open Stock Holding Company “Barqi Tojik” has received loan and grant from the International Development Association and Loan from Asian Infrastructure Investment Bank and intends to apply part of the proceeds to eligible payments under the contract with individual consultant, which shall provide the services as Environmental Consultant of PRG “Energy Loss Reduction”.

21.05.2018 Nurek Hydropower Rehabilitation Phase 1 (deadline until 01.06.2018)

Open Stock Holding Company “Barqi Tojik” has received loan and grant from the International Development Association and Loan from Asian Infrastructure Investment Bank and intends to apply part of the proceeds to eligible payments under the contract with individual consultant, which shall provide the services as Environmental Consultant of PRG “Energy Loss Reduction”.

07.05.2018 Nurek Hydropower Rehabilitation Phase 1

Open Stock Holding Company “Barqi Tojik” has received loan and grant from the International Development Association and Loan from Asian Infrastructure Investment Bank and intends to apply part of the proceeds to eligible payments under the contract with individual consultant, which shall provide the services as Environmental Consultant of PRG “Energy Loss Reduction”.

11.12.2017 Request for expressions of interest for audit of the OSHC “Barqi Tajik” and PRG Energy Loss Reduction for the fiscal year ending December 31, 2017
The OSHC “Barqi Tajik” assigned for selection and recruitment of an audit firm, now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. 

28.11.2017 Construction of new 110/10 kV substation “Temurmalik” and related connection from existing AC substation

This Invitation for Tenders follows the General Procurement Notice No. 8419-GPN-41538 for this project which was published at in Procurement Opportunities on the EBRD website: 28 September 2016. 

23.10.2017 Qairokkum hydropower rehabilitation project - FIDIC engineer

OSHC "Barki Tojik" (the “Client”) has requested the EBR and Development to provide technical assistance for the rehabilitation of the hydro-mechanical and electro-mechanical equipment of the “Qairokkum HPP” to increase dam safety and resilience to climate change, and improve the quality and quantity of electricity supply.

22.08.2017 Request for expression of interest consulting services (deadline until 28.08.2017)
For feedback consultations on the final report on environmental and social impact assessment of the rehabilitation of the Nurek hydropower plant

07.08.2017 Request for expression of interest consulting services (deadline until 21.08.2017)

For feedback consultations on the final report on environmental and social impact assessment of the rehabilitation of the Nurek hydropower plant

05.12.2016 Qairokkum Hydropower Rehabilitation Project
This Invitation for Prequalification follows the General Procurement Notice for this project which was published on the EBRD website, Project Procurement Notices (http://www.ebrd.com/pages/workingwithus/procurement/project.shtml) on 24 July 2015.

25.11.2016 Supply and Installation of Smart Meters, Meter Reading System Equipment, Auditable Billing System in Khujand and Surrounding Municipalities
The first part of SUGD is at its final stage and includes (i) Lot 1. Supply and Installation of Smart Meters, Meter Reading System Equipment, Auditable Billing System in Khujand and Surrounding Municipalities, and (ii) Lot 2 Rehabilitation of Khujand Electrical System. The SUGD Extension Project (the Project) includes the construction of a new substation (Temurmalik) 110/10 kV in the southern part of Kamoli Khujandi Park. It will also include the connection by a 2.5 km /110 kV OHL Double Circuit to another substation and ancillary equipment.

18.11.2016 Request for Expression of Interest Consulting services
Open Stock Holding Company "Barqi Tojik" is state-owned national energy company of the Republic of Tajikistan, located in the capital of Tajikistan, Dushanbe. The main purpose of OSHC "Barqi Tojik" is generation, transmission, distribution and sale of electric and heat power primarily in the local market in Tajikistan. It deals with issues of Republican power stations and networks operation, the generation, transmission, distribution and realization of electric and heat energy in the state.

09.11.2016 Request for Expression of Interest Consulting services
Request for Expression of Interest Consulting services for support in identifying existing deficiencies in revenue, management and developing an action plan to address issues raised in audit reports.

24.10.2016 Qairokkum Hydropower Rehabilitation Project Phase II
The Open Stock Holding Company Barqi Tojik (BT) is a 100% state-owned vertically integrated power utility responsible for generation, transmission and distribution of electricity in Tajikistan. BT intends using loan proceeds from the European Bank for Reconstruction and Development (EBRD) and European Investment Bank (EIB) as well as potential funding from the Green Climate Fund (“GCF”) to finance Phase II of the priority rehabilitation program at the Qairokkum hydro power plant.

04.10.2016 NUREK HYDROPOWER REHABILITATION PROJECT – PHASE I
The Government of the Republic of Tajikistan has applied for financing from the World Bank toward the cost of the Phase I of Nurek Hydropower Rehabilitation Project, and it intends to apply part of the proceeds to payments for goods, works, related services and consulting services to be procured under this project.

28.09.2016 Sugd Energy Loss Reduction Project - Extension
Open Stock Holding Company Barqi Tojik (BT) intends using the proceeds of a loan from the European Bank for Reconstruction and Development [the Bank] for rehabilitation of low and medium voltage distribution networks in the Sugd region, construction of 2 new 110/10kV Substations, installation of electricity meters with ancillary equipment to allow demand side management, reduce distribution network losses and increase energy efficiency. The Project is to be cofinanced by European Investment Bank (EIB) complemented by a grant from EU /Investment Fund for Central Asia (IFCA).

01.04.2016 Request for Expression of Interest (Company Selection) Consulting Services for: Fixed Consultancy ESIA Service for OSHC Barqi Tojik
OSHC "Barqi Tojik" has received grant from the International Development for the Association for the preparation grant for Advisory support for the regional trade initiative project (TF 016252), and intends to apply part of the proceeds of this financing to the providing ESIA and EMP for the project CASA-1000 with a Consulting firm, which shall provide the consulting services for: Environmental Impact Assessment and Environmental Management Plan.

15.02.2016 Sugd Energy Loss Reduction Project
Extended project implementation unit consultancy services 

25.12.2015 General procurement notice. Nurek hydropower rehabilitation project
The project will include the rehabilitation of nine (9) generating units, each with a capacity of about 330 MW, and associated Balance of Plant; dam safety related improvements, environmental and social sustainability; and project management services for design and supervision of the Project. 