Размер шрифта: A A A
Цвет сайта: A A A A

Projects

25.05.2020 Environmental and Social Management Plan (Final)
Environmental and Social Management Plan. Nurek Bridge Rehabilitation. Nurek Hydropower Rehabilitation Project

28.04.2020 Draft Updated Nurek ESIA
Environmental and Social Impact Assessment >>>>>>

17.04.2020 Contract Award Publication Contract No. TJ NHPP RFB P4 - Switchyard

Execution design for replacement of six autotransformers, refurbishment and partial replacement of various high voltage equipment and ancillary systems.

Decontamination of structures with respect to rehabilitation of equipment.

Supply of new equipment and spare parts including shipping to site.

Dismantling of existing equipment, erection and commissioning of new equipment, one group of three single-phase autotransformers at a time, with minimized impact on power plant operation and power production.

Associated civil works.

Supply of new equipment and spare parts including shipping to site.

04.07.2019 Nurek hydropower rehabilitation project. Phase 1

       The Republic of Tajikistan has applied for financing from the World Bank International Development Association, Asian Infrastructure Investment Bank and Eurasian Fund for Stabilization and Development (EFSD) toward the cost of the “Nurek hydropower rehabilitation project. Phase I.”, and intends to apply part of the proceeds toward payments under the Contract for Rehabilitation of Switchyard.

07.02.2019 Nurek hydropower rehabilitation project

The Republic of Tajikistan has received financing from the World Bank International Development Association and Asian Infrastructure Investment Bank toward the cost of the Nurek Hydromechanical Equipment rehabilitation project. It is intended that part of the proceeds of this loan will be applied to eligible payments under the contract for Package 3, Hydromechanical equipment.

16.05.2019 Nurek hydropower rehabilitation project

The Republic of Tajikistan has applied for financing from the World Bank International Development Association and Asian Infrastructure Investment Bank toward the cost of the Nurek hydropower rehabilitation project, and intends to apply part of the proceeds toward payments under the contract for Monitoring equipment and left bank geotechnical investigations.

01.06.2018 Nurek Hydropower Rehabilitation Phase 1 (deadline until 08.06.2018)

Open Stock Holding Company “Barqi Tojik” has received loan and grant from the International Development Association and Loan from Asian Infrastructure Investment Bank and intends to apply part of the proceeds to eligible payments under the contract with individual consultant, which shall provide the services as Environmental Consultant of PRG “Energy Loss Reduction”.

21.05.2018 Nurek Hydropower Rehabilitation Phase 1 (deadline until 01.06.2018)

Open Stock Holding Company “Barqi Tojik” has received loan and grant from the International Development Association and Loan from Asian Infrastructure Investment Bank and intends to apply part of the proceeds to eligible payments under the contract with individual consultant, which shall provide the services as Environmental Consultant of PRG “Energy Loss Reduction”.

07.05.2018 Nurek Hydropower Rehabilitation Phase 1

Open Stock Holding Company “Barqi Tojik” has received loan and grant from the International Development Association and Loan from Asian Infrastructure Investment Bank and intends to apply part of the proceeds to eligible payments under the contract with individual consultant, which shall provide the services as Environmental Consultant of PRG “Energy Loss Reduction”.

11.12.2017 Request for expressions of interest for audit of the OSHC “Barqi Tajik” and PRG Energy Loss Reduction for the fiscal year ending December 31, 2017
The OSHC “Barqi Tajik” assigned for selection and recruitment of an audit firm, now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. 

28.11.2017 Construction of new 110/10 kV substation “Temurmalik” and related connection from existing AC substation

This Invitation for Tenders follows the General Procurement Notice No. 8419-GPN-41538 for this project which was published at in Procurement Opportunities on the EBRD website: 28 September 2016. 

23.10.2017 Qairokkum hydropower rehabilitation project - FIDIC engineer

OSHC "Barki Tojik" (the “Client”) has requested the EBR and Development to provide technical assistance for the rehabilitation of the hydro-mechanical and electro-mechanical equipment of the “Qairokkum HPP” to increase dam safety and resilience to climate change, and improve the quality and quantity of electricity supply.

22.08.2017 Request for expression of interest consulting services (deadline until 28.08.2017)
For feedback consultations on the final report on environmental and social impact assessment of the rehabilitation of the Nurek hydropower plant

07.08.2017 Request for expression of interest consulting services (deadline until 21.08.2017)

For feedback consultations on the final report on environmental and social impact assessment of the rehabilitation of the Nurek hydropower plant

05.12.2016 Qairokkum Hydropower Rehabilitation Project
This Invitation for Prequalification follows the General Procurement Notice for this project which was published on the EBRD website, Project Procurement Notices (http://www.ebrd.com/pages/workingwithus/procurement/project.shtml) on 24 July 2015.

25.11.2016 Supply and Installation of Smart Meters, Meter Reading System Equipment, Auditable Billing System in Khujand and Surrounding Municipalities
The first part of SUGD is at its final stage and includes (i) Lot 1. Supply and Installation of Smart Meters, Meter Reading System Equipment, Auditable Billing System in Khujand and Surrounding Municipalities, and (ii) Lot 2 Rehabilitation of Khujand Electrical System. The SUGD Extension Project (the Project) includes the construction of a new substation (Temurmalik) 110/10 kV in the southern part of Kamoli Khujandi Park. It will also include the connection by a 2.5 km /110 kV OHL Double Circuit to another substation and ancillary equipment.

18.11.2016 Request for Expression of Interest Consulting services
Open Stock Holding Company "Barqi Tojik" is state-owned national energy company of the Republic of Tajikistan, located in the capital of Tajikistan, Dushanbe. The main purpose of OSHC "Barqi Tojik" is generation, transmission, distribution and sale of electric and heat power primarily in the local market in Tajikistan. It deals with issues of Republican power stations and networks operation, the generation, transmission, distribution and realization of electric and heat energy in the state.

09.11.2016 Request for Expression of Interest Consulting services
Request for Expression of Interest Consulting services for support in identifying existing deficiencies in revenue, management and developing an action plan to address issues raised in audit reports.

24.10.2016 Qairokkum Hydropower Rehabilitation Project Phase II
The Open Stock Holding Company Barqi Tojik (BT) is a 100% state-owned vertically integrated power utility responsible for generation, transmission and distribution of electricity in Tajikistan. BT intends using loan proceeds from the European Bank for Reconstruction and Development (EBRD) and European Investment Bank (EIB) as well as potential funding from the Green Climate Fund (“GCF”) to finance Phase II of the priority rehabilitation program at the Qairokkum hydro power plant.

04.10.2016 NUREK HYDROPOWER REHABILITATION PROJECT – PHASE I
The Government of the Republic of Tajikistan has applied for financing from the World Bank toward the cost of the Phase I of Nurek Hydropower Rehabilitation Project, and it intends to apply part of the proceeds to payments for goods, works, related services and consulting services to be procured under this project.


Новости 21 - 40 of 52
First | << | 1 2 3 | >> | Last