OJSC "Yavanskaya TPP"
OJSC "Yavanskaya TPP"
The total installed capacity of 120 MW.
At TPP unit are two of 60 MW. The station was put into operation in 1968.
Director - Ahadov Ashour Ahadovich
Tel .: (+ 992-31-41) 295-350; 295-352
Year: 1968
Aggregates: 2х60 MW
Total installed capacity: 120 MW