Размер шрифта: A A A
Цвет сайта: A A A A

Small hydropower plant "Kuhistan-1"

Small hydropower plant "Kuhistan-1"

Small hydropower plant "Kuhistan-1" is located in the Mountain Match. It was built in 2012.

On 1 hydroelectric power plant installed capacity of 500 kW. The total installed capacity of 500 kW.

During the summer, it cut off to prepare for the autumn-winter period.


Year:  2012
Aggregates:  1х500 kW
Total installed capacity:  500 kW

Back to the list