Projects

19.03.2021 Consulting services for: preparation of emergency preparedness plan for Vakhsh Cascade

At the request of the Government of Tajikistan (GoRT), the World Bank has agreed to finance preparation of an Emergency Preparedness Plan (EPP) for the Vakhsh Cascade in Tajikistan under the Nurek Hydropower Rehabilitation Project.

19.03.2021 Grant 0778-TAJ: Power Sector Development Program
G2 - Procurement of Advanced Metering infrastructure, Low-Voltage and Medium-Voltage Enhancement for Dushanbe, Buston, Dangara, Panjakent, Konibodom, Isfara and Istaravshan, plus Boundary Meters

04.03.2021 Construction 500 KV Transmission Line South, Central and North Parts of Tajikistan
Involuntary acquisition of lands could result in physical and economic displacement warranting the preparation of a site specific Resettlement Action Plan (RAP) to address such issues in a manner to ensure, at least, the same level of well-being of affected people with the project as without it.

01.02.2021 Notice of contract award BT/CSP/1BC

Notice of contract award Supply and Installation for construction of Isfara-1 110/10 kV SS & distribution networks improvements, line & substation project, Subcomponent 1B

05.01.2021 REQUEST FOR PROPOSAL
In the frame of this contract it is planned to dismantle the generator

22.12.2020 Contract Award. Installation of wholesale meters at 500kV, 220kV, 110kV, and 35kV levels
The Republic of Tajikistan has received financing from the Asian Development Bank (ADB) toward the cost of the Wholesale Metering and Transmission Reinforcement Project. Part of this financing will be used for payments under the contract named above. Bidding was open to Bidders from eligible source countries of ADB.

22.12.2020 Contract Award Notice. Power Sector Development Program
Power Sector Development Program. Project Implementation Consultant. ADB Quality and Cost Based Selection (QCBS) 

23.11.2020 Rural Electrification Project
Contract award notice. Preparation of Technical Specifications, with detailed justifications, for the connection of target settlements to Barqi Tojik´s distribution network and Bidding Documents.

14.10.2020 CASA.1000.ESIA Vol 2 North_segment

ANNEXES for the Environmental and Social Impact Assessment. CASA-1000 TRANSMISSION LINE – NORTH SEGMENT Volume II

14.10.2020 CASA.1000. ESIA Vol 1 North _Segment

Environmental and Social Impact Assessment CASA-1000 TRANSMISSION LINE - NORTH SEGMENT Volume 1

06.10.2020 ANNEXES for the Environmental and Social Impact Assessment CASA-1000 TRANSMISSION LINE - CENTRAL SEGMENT Volume II

Environmental and Social Impact Assessment CASA-1000 TRANSMISSION LINE - CENTRAL SEGMENT Volume II

06.10.2020 Environmental and Social Impact Assessment CASA-1000 TRANSMISSION LINE - CENTRAL SEGMENT Volume 1

Environmental and Social Impact Assessment CASA-1000 TRANSMISSION LINE - CENTRAL SEGMENT Volume 1

24.09.2020 ANNEXES for the Environmental and Social Impact Assessment CASA-1000 TRANSMISSION LINE - SOUTH SEGMENT Volume II

ANNEXES for the Environmental and Social Impact Assessment. CASA-1000 TRANSMISSION LINE - SOUTH SEGMENT  Volume II

24.09.2020 Environmental and Social Impact Assessment CASA-1000 TRANSMISSION LINE - SOUTH SEGMENT VOLUME I

Environmental and Social Impact Assessment. CASA-1000 TRANSMISSION LINE - SOUTH SEGMENT  VOLUME I

21.08.2020 Supply and installation of relay protection systems in various substations, and construction of two 500 kv interconnection points in Sugd substation.
CAPS-RP-BT-OCB Supply and Installation of Relay Protection Systems in Various Substations, and Construction of Two 500 kV Interconnection Points in Sugd Substation. 

31.08.2020 Contract Awarded
Project Number: P145054 and P165313

31.08.2020 Contract Awarded
Project Number: P145054 and P165313

05.08.2020 Consulting services for: feasibility study for rehabilitation of the Baipaza HPP (extension of the term until 12.08)

REQUEST FOR EXPRESSIONS OF INTEREST (with extended deadline). Consulting services for: feasibility study for rehabilitation of the Baipaza HPP

23.07.2020 Supply of office equipment and associated supplies for PRG ELRP of OSHC Barqi Tojik

Request for expressions of interest supply of office equipment and associated supplies for PRG ELRP of OSHC Barqi Tojik in the frame of Nurek Rehabilitation Project, Phase 1 

29.07.2020 Wholesale Metering and Transmission Reinforcement Project
Installation of wholesale meters at 500kV, 220kV, 110kV, and 35kV levels


Новости 61 - 80 of 178