Projects
04.08.2026
Semi-Annual Social Safeguards Monitoring Report
Prepared by State Establishment “Project Management Unit for Electro-Energy Sector” (SE “PMUES”) for the Open Joint Stock Company “Barqi Tojik (BT)” and the Asian Development Bank
30.06.2026
Land Acquisition and Resettlement Plan Implementation Compliance Report
20.04.2026
Environmental Monitoring Report
Tajikistan: Reconnection to the Central Asian Power System Project
30.03.2026
Semiannual Environmental Monitoring Report
04.03.2026
Land Acquisition and Resettlement Plan (Draft)
26.02.2026
Social Monitoring Report
12.02.2026
Social Monitoring Report
27.08.2025
Social Monitoring Report
04.08.2025
Tajikistan: Golovnaya 240-Megawatt Hydropower Plant Rehabilitation Project
11.06.2025
Environmental Monitoring Report
TAJ: Reconnection to the Central Asian Power System Project. Semi-annual Environmental Monitoring Report for 01 July – 31 December 2024
06.05.2025
Social Monitoring Report
01.05.2025
Environmental Monitoring Report
26.02.2025
Social Monitoring Report
12.02.2025
Social Monitoring Report
29.10.2024
Tajikistan: Golovnaya 240-Megawatt Hydropower Plant Rehabilitation Project
Prepared by the State Establishment «Project Management Unit for Electro-Energy Sector» (SE«PMUES») for the Executing Agency Open Joint Stock Company «Barqi Tojik» (BT) and the Asian Development Bank (ADB).
25.10.2024
Tajikistan: Reconnection to the Central Asian Power System Project
12.08.2024
Tajikistan: Reconnection to the Central Asian Power System Project
06.08.2024
TAJ: Reconnection to Central Asian Power System Project
1. The Project objective is to ensure the power exchange of Tajikistan with Uzbekistan and the reconnection of Tajikistan with the Central Asian Power System (CAPS). The Project pro-vides for the complete restoration and reconnection of the Tajik power system with Uzbek power system. This means the restoration of parallel operation of the Tajik energy system with the regional one, from which Tajikistan has been cut off in 2009. Within the Project framework in order to synchronize the electrical networks of Tajikistan and Uzbekistan, it is planned to install modern relays, circuit breakers, instrument transformers, auxiliary, and other equipment that will increase system reliability and will be installed at the connection points on 220 kV and 500 kV transmission lines.
03.07.2024
Tajikistan: Power Sector Development Program
29.05.2024
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – INDIVIDUAL CONSULTANT SELECTION)
The OJSC «Barqi Tojik» has received financing from the World Bank toward the cost of the Grant No.: E2850-TAJ- CENTRAL ASIA-SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE “CASA-1000” PROJECT, and intends to apply part of the proceeds for hire of a Claims Specilaist.
The scope of work of the assignment (“the Service”) is included in the ToR and the duration of the contract is 6 months.