Projects
29.10.2024
Tajikistan: Golovnaya 240-Megawatt Hydropower Plant Rehabilitation Project
Prepared by the State Establishment «Project Management Unit for Electro-Energy Sector» (SE«PMUES») for the Executing Agency Open Joint Stock Company «Barqi Tojik» (BT) and the Asian Development Bank (ADB).
25.10.2024
Tajikistan: Reconnection to the Central Asian Power System Project
21.10.2024
Contract Award Publication – Penstock inspection and repairs
Penstock inspection and repairs
12.08.2024
Tajikistan: Reconnection to the Central Asian Power System Project
06.08.2024
TAJ: Reconnection to Central Asian Power System Project
1. The Project objective is to ensure the power exchange of Tajikistan with Uzbekistan and the reconnection of Tajikistan with the Central Asian Power System (CAPS). The Project pro-vides for the complete restoration and reconnection of the Tajik power system with Uzbek power system. This means the restoration of parallel operation of the Tajik energy system with the regional one, from which Tajikistan has been cut off in 2009. Within the Project framework in order to synchronize the electrical networks of Tajikistan and Uzbekistan, it is planned to install modern relays, circuit breakers, instrument transformers, auxiliary, and other equipment that will increase system reliability and will be installed at the connection points on 220 kV and 500 kV transmission lines.
03.07.2024
Tajikistan: Power Sector Development Program
29.05.2024
Request for bids (Until June 12, 2024)
Small works (One-Envelope Bidding Process)
Employer: OJSC Barqi Tojik
Project: Nurek hydropower rehabilitation project
Contract title: Penstock inspection and repairs
Country: Tajikistan
Credit No. 6024-TJ (Portion A), Credit No. 6025-TJ (Portion B), Grant No. D179-TJ
RFB No: TJ NHPP RFB P5
29.05.2024
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – INDIVIDUAL CONSULTANT SELECTION)
The OJSC «Barqi Tojik» has received financing from the World Bank toward the cost of the Grant No.: E2850-TAJ- CENTRAL ASIA-SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE “CASA-1000” PROJECT, and intends to apply part of the proceeds for hire of a Claims Specilaist.
The scope of work of the assignment (“the Service”) is included in the ToR and the duration of the contract is 6 months.
29.05.2024
Tajikistan: Golovnaya 240-Megawatt Hydropower Plant Rehabilitation Project
29.05.2024
Tajikistan: Wholesale Metering and Transmission Reinforcement Project
14.05.2024
REQUEST FOR PROPOSALS
In the frame of the financing of the International Development Association for the Nurek HPP Rehabilitation Project, Phase 1, Open Joint Stock Company "Barqi Tojik" has engaged Project Management Consultant (PMC) to assist implementing agency in preparation and implementation phases of the Project. Considering the overall duration of the Project and the need to have a permanent base for PMC on site to propertly accommodate all the required experts involved in daily supervision of the rehabilitation works as well as supporting PMC staff, it was decided to construct a new 2-story office building on the territory of Nurek HPP.
13.05.2024
Contract Award Publication
Contract Award Publication
Contract No. TJ NHPP RFQ 03 - Supply of Project Office Equipment and Associated Supplies
08.05.2024
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICE – INDIVIDUAL CONSULTANT SELECTION)
TAJIKISTAN
CENTRAL ASIA-SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE “CASA-1000” PROJECT
Grant No.: E2850-TAJ
Assignment Title: State Establishment «Project Management Unit for Electro-Energy Sector»
CENTRAL ASIA-SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE “CASA-1000” PROJECT
02.05.2024
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICE – INDIVIDUAL CONSULTANT SELECTION)
TAJIKISTAN
CENTRAL ASIA-SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE “CASA-1000” PROJECT
Grant No.: E2850-TAJ
18.04.2024
Request for bids
Small works (One-Envelope Bidding Process)
Employer: OJSC Barqi Tojik
Project: Nurek hydropower rehabilitation project
Contract title: Penstock inspection and repairs
Country: Tajikistan
Credit No. 6024-TJ (Portion A), Credit No. 6025-TJ (Portion B), Grant No. D179-TJ
RFB No: TJ NHPP RFB P5
18.04.2024
Tajikistan: Reconnection to the Central Asian Power System Project
01.04.2024
Tajikistan: Wholesale Metering and Transmission Reinforcement Project
01.04.2024
Tajikistan: Reconnection to the Central Asian Power System Project
01.04.2024
Tajikistan: Golovnaya 240-Megawatt Hydropower Plant Rehabilitation Project
01.02.2024
REQUEST FOR EXPRESSIONS OF INTEREST
In the frame of the financing of the International Development Association for the Nurek HPP Rehabilitation Project, Phase 1, OJSC "Barqi Tojik" intends to use part of these funds for financing of the contract to supply of office equipment and associated supplies for PRG “Energy Loss Reduction”.
Новости 1 - 20 of 183
First | << | 1 2 3 4 5 | >> | Last