Projects

24.09.2020 Environmental and Social Impact Assessment CASA-1000 TRANSMISSION LINE - SOUTH SEGMENT VOLUME I

Environmental and Social Impact Assessment. CASA-1000 TRANSMISSION LINE - SOUTH SEGMENT  VOLUME I

21.08.2020 Supply and installation of relay protection systems in various substations, and construction of two 500 kv interconnection points in Sugd substation.
CAPS-RP-BT-OCB Supply and Installation of Relay Protection Systems in Various Substations, and Construction of Two 500 kV Interconnection Points in Sugd Substation. 

31.08.2020 Contract Awarded
Project Number: P145054 and P165313

31.08.2020 Contract Awarded
Project Number: P145054 and P165313

05.08.2020 Consulting services for: feasibility study for rehabilitation of the Baipaza HPP (extension of the term until 12.08)

REQUEST FOR EXPRESSIONS OF INTEREST (with extended deadline). Consulting services for: feasibility study for rehabilitation of the Baipaza HPP

23.07.2020 Supply of office equipment and associated supplies for PRG ELRP of OSHC Barqi Tojik

Request for expressions of interest supply of office equipment and associated supplies for PRG ELRP of OSHC Barqi Tojik in the frame of Nurek Rehabilitation Project, Phase 1 

29.07.2020 Wholesale Metering and Transmission Reinforcement Project
Installation of wholesale meters at 500kV, 220kV, 110kV, and 35kV levels

27.07.2020 Audit of the OSHC “Barqi Tajik” and PRG Energy Loss Reduction

REQUEST FOR EXPRESSIONS OF INTEREST for audit of the OSHC “Barqi Tajik” and PRG Energy Loss Reduction for the fiscal year ending December 31, 2020

21.07.2023 Terms of reference for the audit of OSHC “Barqi Tojik” and Nurek hydropower rehabilitation Project Phase 1

Terms of reference for the audit of OSHC “Barqi Tojik” and Nurek hydropower rehabilitation Project Phase 1 for the fiscal year ending december 31, 2020

22.07.2020 Specific procurement notice

Supply and Installation for construction of Isfara-1 SS & distribution networks improvements 110/10kV, line & substation

21.07.2020 Consulting services for: feasibility study for rehabilitation of the Baipaza HPP

REQUEST FOR EXPRESSIONS OF INTEREST. Consulting Services for: Feasibility Study for Rehabilitation of the Baipaza Hydropower Plant

21.07.2020 Terms of Reference_Rehabilitation of the Baipaza HPP. Feasibility Study

Terms of Reference. Rehabilitation of the Baipaza Hydropower Plant. Feasibility Study 

10.07.2020 Contract Award Publication Contract No. TJ NHPP RFB P2.1 - Dam Safety Investigations and Monitoring
Rehabilitation of Nurek Hydropower Plant Project. TJ NHPP RFB P2.1 - Dam Safety Investigations and Monitoring

10.07.2020 Contract Award Publication Contract No. TJ NHPP RFB P3 - Hydromechanical Equipment

Rehabilitation of Nurek Hydropower Plant Project TJ NHPP RFB P3 - Hydromechanical Equipment


06.07.2020 ESIA - Construction of transmission line:NORTH SEGMENT

Environmental and Social Impact Assessment (ESIA). Construction of transmission line:NORTH SEGMENT

(review draft)

06.07.2020 ESIA - Construction of transmission line: CENTRAL SEGMENT

Environmental and Social Impact Assessment (ESIA). Construction of transmission line: CENTRAL SEGMENT

(review draft)

17.06.2020 Rehabilitation of Golovnaya 110 kV facility and construction of new 110 kV Rudaki substation in Vose district
The project includes the following components: (i) fully rehabilitate 110/35/10kV Vose substation (replace all switchgear; replace and increase the capacity of transformers; built additional 110kV bay and connect substation to SCADA); (ii) construct a new 110/10 kV Rudaki substation with one 110kV and eight 10 kV bays; and (iii) construct a new 10 km 110 kV transmission line connecting Vose substation and the new Rudaki substation. 

25.05.2020 STAKEHOLDER ENGAGEMENT PLAN (Final)
STAKEHOLDER ENGAGEMENT PLAN
Nurek Hydropower Rehabilitation Project Phase 2
Republic of Tajikistan

25.05.2020 Environmental & Social Impact Assessment and Environmental & Social Management Plan
Environmental & Social Impact Assessment and Environmental & Social Management Plan
Nurek Hydropower Rehabilitation Project Phase 2
Republic of Tajikistan

25.05.2020 Environmental and Social Impact Assessment (Final)
Environmental and Social. Impact Assessment. Nurek Hydropower Rehabilitation Project Phase 2
Republic of Tajikistan


Новости 81 - 100 of 185