Projects
24.09.2020
Environmental and Social Impact Assessment CASA-1000 TRANSMISSION LINE - SOUTH SEGMENT VOLUME I
21.08.2020
Supply and installation of relay protection systems in various substations, and construction of two 500 kv interconnection points in Sugd substation.
CAPS-RP-BT-OCB Supply and Installation of Relay Protection Systems in Various Substations, and Construction of Two 500 kV Interconnection Points in Sugd Substation.
29.07.2020
Wholesale Metering and Transmission Reinforcement Project
Installation of wholesale meters at 500kV, 220kV, 110kV, and 35kV levels
22.07.2020
Specific procurement notice
Supply and Installation for construction of Isfara-1 SS & distribution networks improvements 110/10kV, line & substation
06.07.2020
ESIA - Construction of transmission line:NORTH SEGMENT
Environmental and Social Impact Assessment (ESIA). Construction of transmission line:NORTH SEGMENT
(review draft)
06.07.2020
ESIA - Construction of transmission line: CENTRAL SEGMENT
Environmental and Social Impact Assessment (ESIA). Construction of transmission line: CENTRAL SEGMENT
(review draft)
17.06.2020
Rehabilitation of Golovnaya 110 kV facility and construction of new 110 kV Rudaki substation in Vose district
The project includes the following components: (i) fully rehabilitate 110/35/10kV Vose substation (replace all switchgear; replace and increase the capacity of transformers; built additional 110kV bay and connect substation to SCADA); (ii) construct a new 110/10 kV Rudaki substation with one 110kV and eight 10 kV bays; and (iii) construct a new 10 km 110 kV transmission line connecting Vose substation and the new Rudaki substation.
30.03.2020
Environmental and Social Impact Assessment. South segment
Environmental and Social Impact Assessment. South segment
Barqi Tojik (BT) has engaged the Energy Sector Project Management Unit (ESPMU) – a state establishment - to carry out the project activities, including procurement, FM, technical supervision, and monitoring and evaluation (M&E). ESPMU/BT will need support of an experienced consultant to prepare for and supervise various aspects of the proposed grid-connection works.
29.01.2020
Rural Electrification Project
Provision of electricity service to target settlements in Khatlon region
Grant No.: P170132
Assignment Title: PMC
21.11.2019
Power Utility Financial Recovery Program-for-Results
Barqi Tojik is fully owned by the Government. It owns and operates most of the electricity generating plants and is also responsible for electricity transmission, dispatch, and distribution services to around 8 million people in all regions of the country except for Gorno-Badakhshan Autonomous Oblast (GBAO) region of Tajikistan.
07.10.2019
Project: Reconnection to the Central Asian Power System Project
29.11.2019
Environmental and Social Impact Assessment for Converter and Electrode Stations
. CASA 100 project objective. The proposed CASA-1000 project will facilitate the first electricity trade of 1,300 megawatts (MW) of existing summertime hydropower surplus between the two regions, involving the Kyrgyz Republic and Tajikistan in Central Asia and Afghanistan and Pakistan in South Asia. Project preparation was guided by the 4-country minister-level Inter-Governmental Council (IGC) and through consultations with the 10-member Central Asian Regional Economic Cooperation (CAREC) program. A Secretariat of the CASA-1000 project was put in place in 2011. The project is expected to consist of the construction and operation of transmission infrastructure in the four countries. The Project has purpose and would contribute to alleviating power supply shortages in Pakistan and Afghanistan and would enhance revenues and economic prospects in the Kyrgyz Republic and Tajikistan.
31.01.2019
INVITATION for expressions of interest for the provision of
The Republic of Tajikistan has applied for a grant financing with the Asian Development Bank (ADB) for the implementation of Reconnection to the Central Asian Power System Project and intends to apply part of the proceeds of this grant to pay for consulting services in project implementation period. The project consists of the following components:
28.01.2019
Asian Development Bank will be connected the Tajik Power Network with Energy Power Grid of Central Asia. It will help to republic sell their excess energy.
In November 23, 2018 between Government of Tajikistan and ADB was signed the Grant Agreement in the amount of $35 million, which will be directed to complete reconnection of electric-power system of Tajikistan with Power Network of Uzbekistan. This implies that from 2009 year the reconstruction of the parallel operations of tajik energy system was disconnected in some region.
05.05.2017
Golovnaya 240 MW HPP Rehabilitation Project
Lot 2: Rehabilitation Works of Switchyards of Golovnaya Hydropower Plant
Results of International Competitive Bidding for Plant Design, Supply and Install
18.04.2017
Request for expressions of interest consultant services –financial audit
The Republic of Tajikistan has received financing from the Islamic Development Bank toward the cost of the Reconstruction of Ravshan Electricity Substation project and intends to apply part of the proceeds for consultant services. The services include Audit of Project’s Financial Statement and preparation of its Report. Please refer to the General Procurement Notice for this project that appeared in Jumhuriat Newspaper under No. 75, dated 29 April 2014 and 20 May 2014.
31.10.2016
Wholesale Metering and Transmission Reinforcement Project
ADB Grant 0417-TAJ: Wholesale Metering and Transmission Reinforcement Project
Lot 1: “Replacement of electricity meters, replacement of several current transformers, replacement of several voltage transformers, Introduction of an advanced metering infrastructure and introduction of a settlement system”
Procurement Method: ADB Single-Stage, Two Envelope Bidding Procedure
31.10.2016
Rehabilitation Works for Generation Units of Golovnaya HPP
ADB Grant 0376-TAJ: Golovnaya 240 MW HPP Rehabilitation Project
Lot 1: Rehabilitation Works for Generation Units of Golovnaya HPP
Results of International Competitive Bidding for Plant Design, Supply and Install
Procurement Method: ADB Two Stage Bidding Process
02.06.2016
Golovnaya 240 MW Hydropower Plant Rehabilitation Project
The Open Joint Stock Holding Company “Barqi Tojik” (“the Employer”) invites sealed bids from eligible bidders for the construction and completion of Rehabilitation Works of Switchyards of Golovnaya Hydropower Plant (“the Facilities”).
Новости 61 - 80 of 84
First | << | 1 2 3 4 5 | >> | Last