Размер шрифта: A A A
Цвет сайта: A A A A

Projects

28.11.2017 Construction of new 110/10 kV substation “Temurmalik” and related connection from existing AC substation

This Invitation for Tenders follows the General Procurement Notice No. 8419-GPN-41538 for this project which was published at in Procurement Opportunities on the EBRD website: 28 September 2016. 

23.10.2017 Qairokkum hydropower rehabilitation project - FIDIC engineer

OSHC "Barki Tojik" (the “Client”) has requested the EBR and Development to provide technical assistance for the rehabilitation of the hydro-mechanical and electro-mechanical equipment of the “Qairokkum HPP” to increase dam safety and resilience to climate change, and improve the quality and quantity of electricity supply.

08.09.2017 Initial Resettlement Action Plan for the CASA 1000 Project

Request for expression of interest (company selection) consulting services for: initial resettlement action plan for the CASA 1000 Project

24.08.2017 Nurek hydropower rehabilitation project

The Republic of Tajikistan has applied for financing from the World Bank International Development Association and Asian Infrastructure Investment Bank toward the cost of the Nurek hydropower rehabilitation project, intends to apply for financing for the Phase 2 of the Project and intends to apply part of the proceeds toward payments under the Contract for Power plant rehabilitation.

22.08.2017 Request for expression of interest consulting services (deadline until 28.08.2017)
For feedback consultations on the final report on environmental and social impact assessment of the rehabilitation of the Nurek hydropower plant

07.08.2017 Request for expression of interest consulting services (deadline until 21.08.2017)

For feedback consultations on the final report on environmental and social impact assessment of the rehabilitation of the Nurek hydropower plant

05.05.2017 Golovnaya 240 MW HPP Rehabilitation Project

Lot 2: Rehabilitation Works of Switchyards of Golovnaya Hydropower Plant

Results of International Competitive Bidding for Plant Design, Supply and Install

25.04.2017 Contract Awarded by QCBS

Contract Awarded by QCBS (Project Implementation Unit Consultancy Services for Temurmalik Substation)

18.04.2017 Request for expressions of interest consultant services –financial audit
The Republic of Tajikistan has received financing from the Islamic Development Bank toward the cost of the Reconstruction of Ravshan Electricity Substation project and intends to apply part of the proceeds for consultant services. The services include Audit of Project’s Financial Statement and preparation of its Report. Please refer to the General Procurement Notice for this project that appeared in Jumhuriat Newspaper under No. 75, dated 29 April 2014 and 20 May 2014.

25.01.2017 Nurek Hydropower Plant Rehabilitation Project-Final ESIA Report
Final ESIA Report (in English language)

25.01.2017 Nurek Hydropower Plant Rehabilitation Project
Final Minutes of Public Consultations on ESIA (in English language)

25.01.2017 Nurek Hydropower Plant Rehabilitation Project-Final Stakeholder Engagement Plan
Final Stakeholder Engagement Plan (in English language)


REQUEST FOR EXPRESSIONS OF INTEREST For OWNER’S ENGINEER
This EOI follows the general procurement notice for this project that appeared in Development Business No: P145054 of November 11th, 2013 online and Bank’s External website. This is EOI the re-invitation for expression of interest following a revision of the initial configuration of the CASA project and corresponding scope of services related to the HVDC convertor stations and HVDC line.

24.01.2017 Advisory Support for the Regional Trade Initiative Project
Advisory Support for the Regional Trade Initiative Project.

24.01.2017 PPA for Winter Energy Project
PPA for Winter Energy Project 

24.01.2017 Rehabilitation of Nurek Hydropower Plant Project
Rehabilitation of Nurek Hydropower Plant Project

21.12.2016 Capacity building tostrengthen the climate resilience of energy sector assetsand investments.

 The objective of the “Capacity Building Program to Strengthen the Climate Resilience of Energy Sector Assets & Investments” (the CBP) is to build the capacity of the state utility Barki Tojik together with the state hydro-meteorology agency Tajik Hydromet (TH) and other relevant institutions to be more aware of the effects of climate change and to be better equipped to manage the impacts on water resources and hydropower generation. 

13.12.2016 Rehabilitation of Nurek HPP and Dam Safety Provision

The Nurek Dam, commissioned in 1972, is the highest dam in the world (300 m high). It is a large earth-fill dam with 3,000 MW of installed capacity. It controls the Vakhsh River, main Amu Darya River affluent with the Pyanj River. The Amu Darya is the largest river of Central Asia, and one of the two main tributaries of the Aral Sea.

05.12.2016 Qairokkum Hydropower Rehabilitation Project
This Invitation for Prequalification follows the General Procurement Notice for this project which was published on the EBRD website, Project Procurement Notices (http://www.ebrd.com/pages/workingwithus/procurement/project.shtml) on 24 July 2015.

25.11.2016 Supply and Installation of Smart Meters, Meter Reading System Equipment, Auditable Billing System in Khujand and Surrounding Municipalities
The first part of SUGD is at its final stage and includes (i) Lot 1. Supply and Installation of Smart Meters, Meter Reading System Equipment, Auditable Billing System in Khujand and Surrounding Municipalities, and (ii) Lot 2 Rehabilitation of Khujand Electrical System. The SUGD Extension Project (the Project) includes the construction of a new substation (Temurmalik) 110/10 kV in the southern part of Kamoli Khujandi Park. It will also include the connection by a 2.5 km /110 kV OHL Double Circuit to another substation and ancillary equipment.


Новости 121 - 140 of 180
First | << | 5 6 7 8 9 | >> | Last