24.01.2017 Rehabilitation of Nurek Hydropower Plant Project
Rehabilitation of Nurek Hydropower Plant Project

21.12.2016 Capacity building tostrengthen the climate resilience of energy sector assetsand investments.

 The objective of the “Capacity Building Program to Strengthen the Climate Resilience of Energy Sector Assets & Investments” (the CBP) is to build the capacity of the state utility Barki Tojik together with the state hydro-meteorology agency Tajik Hydromet (TH) and other relevant institutions to be more aware of the effects of climate change and to be better equipped to manage the impacts on water resources and hydropower generation. 

13.12.2016 Rehabilitation of Nurek HPP and Dam Safety Provision

The Nurek Dam, commissioned in 1972, is the highest dam in the world (300 m high). It is a large earth-fill dam with 3,000 MW of installed capacity. It controls the Vakhsh River, main Amu Darya River affluent with the Pyanj River. The Amu Darya is the largest river of Central Asia, and one of the two main tributaries of the Aral Sea.

05.12.2016 Qairokkum Hydropower Rehabilitation Project
This Invitation for Prequalification follows the General Procurement Notice for this project which was published on the EBRD website, Project Procurement Notices (http://www.ebrd.com/pages/workingwithus/procurement/project.shtml) on 24 July 2015.

25.11.2016 Supply and Installation of Smart Meters, Meter Reading System Equipment, Auditable Billing System in Khujand and Surrounding Municipalities
The first part of SUGD is at its final stage and includes (i) Lot 1. Supply and Installation of Smart Meters, Meter Reading System Equipment, Auditable Billing System in Khujand and Surrounding Municipalities, and (ii) Lot 2 Rehabilitation of Khujand Electrical System. The SUGD Extension Project (the Project) includes the construction of a new substation (Temurmalik) 110/10 kV in the southern part of Kamoli Khujandi Park. It will also include the connection by a 2.5 km /110 kV OHL Double Circuit to another substation and ancillary equipment.

18.11.2016 Request for Expression of Interest Consulting services
Open Stock Holding Company "Barqi Tojik" is state-owned national energy company of the Republic of Tajikistan, located in the capital of Tajikistan, Dushanbe. The main purpose of OSHC "Barqi Tojik" is generation, transmission, distribution and sale of electric and heat power primarily in the local market in Tajikistan. It deals with issues of Republican power stations and networks operation, the generation, transmission, distribution and realization of electric and heat energy in the state.

09.11.2016 Request for Expression of Interest Consulting services
Request for Expression of Interest Consulting services for support in identifying existing deficiencies in revenue, management and developing an action plan to address issues raised in audit reports.

31.10.2016 Wholesale Metering and Transmission Reinforcement Project

ADB Grant 0417-TAJ: Wholesale Metering and Transmission Reinforcement Project

Lot 1: “Replacement of electricity meters, replacement of several current transformers, replacement of several voltage transformers, Introduction of an advanced metering infrastructure and introduction of a settlement system”

Procurement Method: ADB Single-Stage, Two Envelope Bidding Procedure

31.10.2016 Rehabilitation Works for Generation Units of Golovnaya HPP

ADB Grant 0376-TAJ: Golovnaya 240 MW HPP Rehabilitation Project

Lot 1: Rehabilitation Works for Generation Units of Golovnaya HPP

Results of International Competitive Bidding for Plant Design, Supply and Install

Procurement Method: ADB Two Stage Bidding Process

24.10.2016 Qairokkum Hydropower Rehabilitation Project Phase II
The Open Stock Holding Company Barqi Tojik (BT) is a 100% state-owned vertically integrated power utility responsible for generation, transmission and distribution of electricity in Tajikistan. BT intends using loan proceeds from the European Bank for Reconstruction and Development (EBRD) and European Investment Bank (EIB) as well as potential funding from the Green Climate Fund (“GCF”) to finance Phase II of the priority rehabilitation program at the Qairokkum hydro power plant.

17.10.2016 Supply & Installation of Bi-Pole HVDC Converter Stations in Pakistan and Tajikistan associated with CASA 1000
1.0 This invitation for bids follows the general procurement notice for this project that appeared in Development Business No: P145054 of November 11th, 2013 on-line and Bank’s external website. This re-invitation is based on revised configuration scope/qualification requirements after cancellation of earlier bidding process based on previous IFB of October 24th 2014.

04.10.2016 NUREK HYDROPOWER REHABILITATION PROJECT – PHASE I
The Government of the Republic of Tajikistan has applied for financing from the World Bank toward the cost of the Phase I of Nurek Hydropower Rehabilitation Project, and it intends to apply part of the proceeds to payments for goods, works, related services and consulting services to be procured under this project.

28.09.2016 Sugd Energy Loss Reduction Project - Extension
Open Stock Holding Company Barqi Tojik (BT) intends using the proceeds of a loan from the European Bank for Reconstruction and Development [the Bank] for rehabilitation of low and medium voltage distribution networks in the Sugd region, construction of 2 new 110/10kV Substations, installation of electricity meters with ancillary equipment to allow demand side management, reduce distribution network losses and increase energy efficiency. The Project is to be cofinanced by European Investment Bank (EIB) complemented by a grant from EU /Investment Fund for Central Asia (IFCA).

02.06.2016 Golovnaya 240 MW Hydropower Plant Rehabilitation Project

The Open Joint Stock Holding Company “Barqi Tojik” (“the Employer”) invites sealed bids from eligible bidders for the construction and completion of Rehabilitation Works of Switchyards of Golovnaya Hydropower Plant (“the Facilities”).

01.04.2016 Request for Expression of Interest (Company Selection) Consulting Services for: Fixed Consultancy ESIA Service for OSHC Barqi Tojik
OSHC "Barqi Tojik" has received grant from the International Development for the Association for the preparation grant for Advisory support for the regional trade initiative project (TF 016252), and intends to apply part of the proceeds of this financing to the providing ESIA and EMP for the project CASA-1000 with a Consulting firm, which shall provide the consulting services for: Environmental Impact Assessment and Environmental Management Plan.

15.02.2016 Sugd Energy Loss Reduction Project
Extended project implementation unit consultancy services 

25.12.2015 General procurement notice. Nurek hydropower rehabilitation project
The project will include the rehabilitation of nine (9) generating units, each with a capacity of about 330 MW, and associated Balance of Plant; dam safety related improvements, environmental and social sustainability; and project management services for design and supervision of the Project. 

17.12.2015 Request for expressions of interest for provision of consultancy services for project management consultancy for the rehabilitation of Nurek hydropower plant project

This request for expression of interest (EOI) for Project Management consultancy services for the Nurek Hydropower Plant Rehabilitation Project follows the need to have a Project Management Consultant that will supervise all works done by the contractors on behalf of the OSHC “Barqi Tojik”.

27.11.2015 CASA-1000
Open Stock Holding Power Company "Barki Tojik" has received grant from the International Development for the Association for the preparation grant for Advisory support for the regional trade initiative project (TF 016252), and intends to apply part of the proceeds of this financing to the providing ESIA and EMP for the project CASA-1000 with a Consulting firm, which shall provide the consulting services for: Environmental Impact Assessment and Environmental Management Plan.

25.11.2015 Wholesale Metering and Transmission Reinforcement Project.

The Republic of Tajikistan has received financing (grant) from the Asian Development Bank (ADB) towards the cost Wholesale Metering and Transmission Reinforcement Project.Parts of this financing will be used for payments under the contract for Replacement of electricity meters, replacement of several current transformers, replacement of several voltage transformers, introduction of an advanced metering infrastructure, and introduction of a settlement system.Bidding is open to all bidders from eligible source countries of the ADB. 