Размер шрифта: A A A
Цвет сайта: A A A A

Projects

01.02.2022 Tajikistan: Wholesale Metering and Transmission Reinforcement Project

This environmental monitoring report is a document of the borrower. The views expressed herein do not
necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary
in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or
reference to a particular territory or geographic area in this document, the Asian Development Bank
does not intend to make any judgments as to the legal or other status of any territory or area.

01.02.2022 Tajikistan: Golovnaya 240 MW Hydropower Plant Rehabilitation Project

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area

01.02.2022 Tajikistan: Reconnection to the Central Asian Power System Project

Prepared by Project Management Unit for Electro-Energy Sector for OSHC Barqi Tojik and the
Asian Development Bank
This environmental monitoring report is a document of the borrower. The views expressed herein
do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may
be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation
of or reference to a particular territory or geographic area in this document, the Asian
Development Bank does not intend to make any judgments to the legal or other status of any
territory or area.

30.03.2022 Specific Procurement Notice Request for Bids

Specific Procurement Notice

Request for Bids

Employer: OSHC “Barqi Tojik”

Project: RURAL ELECTRIFICATION PROJECT

Contract title: Plant, Design, Supply, and Installation of Works for the Construction of the 10 kV Medium Voltage Power Lines and Associated LV Networks for Target Settlements in Khatlon Region

Country: Republic of Tajikistan

Grant No.: D-504 TJ

RFB No: BT/C/01

Issued on: 30.03.2022

18.02.2022 Contract Award Notice

Contract No.TJ NHPP CS 17: Consulting Services for Preparation of Emergency Preparedness Plan for Vakhsh Cascade

Project Name: Nurek Hydropower Rehabilitation Project, Phase 1

14.12.2021 Tajikistan: Regional Power Transmission Project

I. PROJECT DESCRIPTION
1. Tajikistan has made great strides in developing its power supply system since its
independence in 1991. However, the country’s power sector suffers from incomplete policies
and timid sector reforms, multiple structural weaknesses, and insufficiencies in sector core
functions (i.e., generation, transmission, and distribution) as well as inefficient consumption
by households, businesses, and government consumers.1 This is compounded by a
ballooning debt crisis that has become unsustainable. The main contributors to this crisis are
underpricing and nonpayment, high power system losses, aged and obsolete metering and
billing systems, weakness in financial management, insufficient cash flow, high debt service
obligations, large foreign exchange losses on grants and loans, lack of accountability, little
transparency, and poor sector governance.

23.09.2021 Community Support Project CASA-1000

Supply and installation contract for village electricity in Sogd, Khatlon, RRS Regions & Vorukh and Chorkuh –Village electricity supply improvements in the corridor of impact,

Subcomponent 1A

02.09.2021 Environmental and Social Impact Assessment (ESIA)

Environmental and Social Impact Assessment (ESIA)
of the subcomponent 1b - construction of a new 110/10 kV Isfara-1 substation with the associated construction of a 10-0.4 kV distribution network for power supply to the projected settlement

06.08.2021 Resettlement Action Plan

Resettlement Action Plan. Section: 66 kV electrode line and 220kV HVAC Transmission Line Route (T/L South segment)

15.07.2021 Request for bids Rural Electrification Project, Component 2: Provision of Electricity Service to Target Settlements in Khatlon Region

Plant, Design, Supply, and Installation of Works for the Construction of the 10 kV Medium Voltage Power Lines and Associated LV Networks for Target Settlements in Khatlon Region

05.07.2021 Invitation for tenders two stage

Supply and Installation of Billing and Metering Infrastructure and Rehabilitation of Distribution Lines 0.4 KV Single Circuit ABC in the Cities of Kulob and Bokhtar Including Surroundings

30.06.2021 Resettlement Action Plan Section: 500 HVAC Transmission Line Route (T/L Central segment)

Construction 500 KV Transmission Line South, Central and North Parts of Tajikistan

11.05.2021 Grant 0778-TAJ: Power Sector Development Program (extension of the term until 15.06.2021)
G2 - Procurement of Advanced Metering infrastructure, Low-Voltage and Medium-Voltage Enhancement for Dushanbe, Buston, Dangara, Panjakent, Konibodom, Isfara and Istaravshan, plus Boundary Meters

06.05.2021 Notification of Contract Awarded by QCBS
Project contract award: Rehabilitation of Nurek hydroelectric power plant Phase I 

06.05.2021 Consulting services for: Feasibility study for new Tajikistan-Afghanistan high voltage interconnection line

The World Bank has agreed to provide financing under the Nurek Hydropower Rehabilitation Project to Barqi Tojik to carry out the necessary techno-economic studies and assessments for new Tajikistan-Afghanistan high voltage interconnection line project. 

28.04.2021 Environmental and Social Impact Assessment (ESIA) of the subcomponent 1b - construction of a new 110/10 kV Isfara-1 substation with the associated construction of a 10-0.4 kV distribution network for power supply to the projected settlement

CSP Project Development Objective. The Project Development Objective is to increase quality of and access to energy, social and economic infrastructure services, and contribute to the strengthening of local governance capacity in communities in the project area. 

19.04.2021 ADB Grant 0622-TAJ: Reconnection to the Central Asian Power System Project
Contract Award Notice

19.04.2021 ADB Grant 0622 : Contract Award Notice. Supply and installation of relay protection systems in various substations, and construction of two 500 kv interconnection points in Sugd substation.
0622-TAJ:  Reconnection to Central Asian Power System, Package 1

16.04.2021 Construction 500 KV transmission line South, Central and North parts of Tajikistan

Resettlement Action Plan. Section: 500 HVAC Transmission Line Route (T/L South segment). (Draft)

30.03.2021 Specific Procurement Notice Request for Bids
CASA-1000 COMMUNITY SUPPORT PROJECT. Subcomponent 1A Supply and installation contract for village electricity in Sogd, Khatlon, RRS Regions & Vorukh and Chorkuh –Village electricity supply improvements in the corridor of impact


Новости 41 - 60 of 178
First | << | 1 2 3 4 5 | >> | Last