17.05.2023
TAJ: Golovnaya 240 MW Hydropower Plant Rehabilitation Project
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
16.05.2023
CASA-1000 COMMUNITY SUPPORT PROJECT ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN
1. PROJECT AND ALTERNATIVES DESCRIPTION
Description of the Subproject In frame of subcomponent 1B of the CASA-1000 Community Support project it is proposed to build 110/10 kV «Isfara-1» Substation in Isfara district of Sughd province at the 0,33 ha area or 3290м2 (size 70mх47m) of state owned lands, and its supporting infrastructure as 110kV power transmission lines to connect this substation to the existing 110kV power transmission line (length 0.5 km), 10kV power transmission lines outgoing from the substation (length 9.6 km l), 0.4 kV power lines for connecting consumers in Vakhdat settlement (length 24 km) as well as a double-circuit 10 kV power transmission line and for ringing with operating 10 kV overhead lines extending from the existing 110/35/10 kV Isfara substation (length 2.5 km). Details of the proposed activities and components are provided below.
10.05.2023
Republic of Tajikistan: Wholesale Metering and Transmission Reinforcement Project (Financed by the Asian Development Bank)
Prepared by Implementing Agency: State Establishment «Project Management Unit for Electro-Energy Sector» (SE «PMUES») with support of Mercados Aries International -Project Implementation Consultant for the Executing Agency Open Stock Holding Company «Barqi Tojik»(BT), and the Asian Development Bank.
This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
03.02.2023
Semi-Annual Social Safeguards Monitoring Report
This Semii-annual social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
16.01.2023
TAJ: Power Sector Development Program
Prepared by Implementing Agency State Establishment “Project Management Unit for Electro-Energy Sector” (SE “PMUES”) for the Executing Agency Ministry of Energy and Water Resources and the Asian Development Bank.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
16.01.2023
Tajikistan: Golovnaya 240-Megawatt Hydropower Plant Rehabilitation Project
Prepared by the State Establishment «Project Management Unit for Electro-Energy Sector» (SE «PMUES») for the Executing Agency Open Stock Holding Company «Barqi Tojik» (BT) and the Asian Development Bank.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
21.12.2022
TAJ: Reconnection to Central Asian Power System Project
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
20.12.2022
Tajikistan: Wholesale Metering and Transmission Reinforcement Project
Prepared by Implementing Agency: State Establishment «Project Management Unit for Electro-Energy Sector» (SE «PMUES») for the Executing Agency Open Stock Holding Company «Barqi Tojik» (BT), and the Asian Development Bank.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
01.11.2022
Semi-Annual Social Safeguards Monitoring Report
This bi-annual social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area
19.10.2022
Republic of Tajikistan: Wholesale Metering and Transmission Reinforcement Project
Prepared by Implementing Agency: State Establishment «Project Management Unit for Electro-Energy Sector» (SE «PMUES») with support of Mercados Aries International -Project Implementation Consultant for the Executing Agency Open Stock Holding Company «Barqi Tojik»(BT), and the Asian Development Bank.
This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
10.08.2022
Tajikistan: Wholesale Metering and Transmission Reinforcement Project
Prepared by Implementing Agency: State Establishment «Project Management Unit for
Electro-Energy Sector» (SE «PMUES») for the Executing Agency Open Stock Holding
Company «Barqi Tojik» (BT), and the Asian Development Bank.
This environmental monitoring report is a document of the borrower. The views expressed herein do not
necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary
in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or
reference to a particular territory or geographic area in this document, the Asian Development Bank
does not intend to make any judgments as to the legal or other status of any territory or area.
10.08.2022
Tajikistan: Reconnection to the Central Asian Power System Project
Prepared by Project Management Unit for Electro-Energy Sector for OJSHC “BarqiTojik” and the Asian Development Bank
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
23.06.2022
Tajikistan: Power Sector Development Program
Prepared by Implementing Agency: State Establishment «Project Management Unit for Electro-Energy Sector» (SE «PMUES») for the Executing Agency Open Stock Holding Company «Barqi Tojik» (BT), and the Asian Development Bank.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
14.06.2022
Tajikistan: Golovnaya 240 MW Hydropower Plant Rehabilitation Project Prepared
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
01.02.2022
Tajikistan: Wholesale Metering and Transmission Reinforcement Project
This environmental monitoring report is a document of the borrower. The views expressed herein do not
necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary
in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or
reference to a particular territory or geographic area in this document, the Asian Development Bank
does not intend to make any judgments as to the legal or other status of any territory or area.
01.02.2022
Tajikistan: Golovnaya 240 MW Hydropower Plant Rehabilitation Project
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area
01.02.2022
Tajikistan: Reconnection to the Central Asian Power System Project
Prepared by Project Management Unit for Electro-Energy Sector for OSHC Barqi Tojik and the
Asian Development Bank
This environmental monitoring report is a document of the borrower. The views expressed herein
do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may
be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation
of or reference to a particular territory or geographic area in this document, the Asian
Development Bank does not intend to make any judgments to the legal or other status of any
territory or area.
14.12.2021
Tajikistan: Regional Power Transmission Project
I. PROJECT DESCRIPTION
1. Tajikistan has made great strides in developing its power supply system since its
independence in 1991. However, the country’s power sector suffers from incomplete policies
and timid sector reforms, multiple structural weaknesses, and insufficiencies in sector core
functions (i.e., generation, transmission, and distribution) as well as inefficient consumption
by households, businesses, and government consumers.1 This is compounded by a
ballooning debt crisis that has become unsustainable. The main contributors to this crisis are
underpricing and nonpayment, high power system losses, aged and obsolete metering and
billing systems, weakness in financial management, insufficient cash flow, high debt service
obligations, large foreign exchange losses on grants and loans, lack of accountability, little
transparency, and poor sector governance.
02.09.2021
Environmental and Social Impact Assessment (ESIA)
Environmental and Social Impact Assessment (ESIA)
of the subcomponent 1b - construction of a new 110/10 kV Isfara-1 substation with the associated construction of a 10-0.4 kV distribution network for power supply to the projected settlement
06.08.2021
Resettlement Action Plan
Resettlement Action Plan. Section: 66 kV electrode line and 220kV HVAC Transmission Line Route (T/L South segment)