Projects
25.05.2020
Environmental and Social Management Plan (Final)
Environmental and Social Management Plan. Nurek Bridge Rehabilitation. Nurek Hydropower Rehabilitation Project
13.05.2020
CONSTRUCTION OF TRANSMISSION LINE: SOUTHERN SEGMENT
Environmental and Social Impact Assessment
13.05.2020
CONSTRUCTION OF TRANSMISSION LINE: SOUTHERN SEGMENT
Environmental and Social Impact Assessment
28.04.2020
Draft Updated Nurek ESIA
Environmental and Social Impact Assessment >>>>>>
17.04.2020
Contract Award Publication Contract No. TJ NHPP RFB P4 - Switchyard
Execution design for replacement of six autotransformers, refurbishment and partial replacement of various high voltage equipment and ancillary systems.
Decontamination of structures with respect to rehabilitation of equipment.
Supply of new equipment and spare parts including shipping to site.
Dismantling of existing equipment, erection and commissioning of new equipment, one group of three single-phase autotransformers at a time, with minimized impact on power plant operation and power production.
Associated civil works.
Supply of new equipment and spare parts including shipping to site.
30.03.2020
Environmental and Social Impact Assessment. South segment
Environmental and Social Impact Assessment. South segment
18.03.2020
Contract Awarded
Project Name: Central Asia South Asia Electricity Transmission and Trade CASA-1000 Project
Barqi Tojik (BT) has engaged the Energy Sector Project Management Unit (ESPMU) – a state establishment - to carry out the project activities, including procurement, FM, technical supervision, and monitoring and evaluation (M&E). ESPMU/BT will need support of an experienced consultant to prepare for and supervise various aspects of the proposed grid-connection works.
29.01.2020
Rural Electrification Project
Provision of electricity service to target settlements in Khatlon region
Grant No.: P170132
Assignment Title: PMC
24.12.2019
Independent Environmental Monitoring Consultant (IEMC) for OSHC “Barqi Tojik”
The Republic of Tajikistan has received financing from the World Bank toward the cost of the TFOA4615-TAJ, and intends to apply part of the proceeds for consulting services.
21.11.2019
Power Utility Financial Recovery Program-for-Results
Barqi Tojik is fully owned by the Government. It owns and operates most of the electricity generating plants and is also responsible for electricity transmission, dispatch, and distribution services to around 8 million people in all regions of the country except for Gorno-Badakhshan Autonomous Oblast (GBAO) region of Tajikistan.
07.10.2019
Project: Reconnection to the Central Asian Power System Project
29.11.2019
Environmental and Social Impact Assessment for Converter and Electrode Stations
. CASA 100 project objective. The proposed CASA-1000 project will facilitate the first electricity trade of 1,300 megawatts (MW) of existing summertime hydropower surplus between the two regions, involving the Kyrgyz Republic and Tajikistan in Central Asia and Afghanistan and Pakistan in South Asia. Project preparation was guided by the 4-country minister-level Inter-Governmental Council (IGC) and through consultations with the 10-member Central Asian Regional Economic Cooperation (CAREC) program. A Secretariat of the CASA-1000 project was put in place in 2011. The project is expected to consist of the construction and operation of transmission infrastructure in the four countries. The Project has purpose and would contribute to alleviating power supply shortages in Pakistan and Afghanistan and would enhance revenues and economic prospects in the Kyrgyz Republic and Tajikistan.
31.01.2019
INVITATION for expressions of interest for the provision of
The Republic of Tajikistan has applied for a grant financing with the Asian Development Bank (ADB) for the implementation of Reconnection to the Central Asian Power System Project and intends to apply part of the proceeds of this grant to pay for consulting services in project implementation period. The project consists of the following components:
28.01.2019
Asian Development Bank will be connected the Tajik Power Network with Energy Power Grid of Central Asia. It will help to republic sell their excess energy.
In November 23, 2018 between Government of Tajikistan and ADB was signed the Grant Agreement in the amount of $35 million, which will be directed to complete reconnection of electric-power system of Tajikistan with Power Network of Uzbekistan. This implies that from 2009 year the reconstruction of the parallel operations of tajik energy system was disconnected in some region.
04.07.2019
Nurek hydropower rehabilitation project. Phase 1
The Republic of Tajikistan has applied for financing from the World Bank International Development Association, Asian Infrastructure Investment Bank and Eurasian Fund for Stabilization and Development (EFSD) toward the cost of the “Nurek hydropower rehabilitation project. Phase I.”, and intends to apply part of the proceeds toward payments under the Contract for Rehabilitation of Switchyard.
07.02.2019
Nurek hydropower rehabilitation project
The Republic of Tajikistan has received financing from the World Bank International Development Association and Asian Infrastructure Investment Bank toward the cost of the Nurek Hydromechanical Equipment rehabilitation project. It is intended that part of the proceeds of this loan will be applied to eligible payments under the contract for Package 3, Hydromechanical equipment.
16.05.2019
Nurek hydropower rehabilitation project
The Republic of Tajikistan has applied for financing from the World Bank International Development Association and Asian Infrastructure Investment Bank toward the cost of the Nurek hydropower rehabilitation project, and intends to apply part of the proceeds toward payments under the contract for Monitoring equipment and left bank geotechnical investigations.
01.06.2018
Nurek Hydropower Rehabilitation Phase 1 (deadline until 08.06.2018)
Open Stock Holding Company “Barqi Tojik” has received loan and grant from the International Development Association and Loan from Asian Infrastructure Investment Bank and intends to apply part of the proceeds to eligible payments under the contract with individual consultant, which shall provide the services as Environmental Consultant of PRG “Energy Loss Reduction”.
01.06.2018
Sugd Energy Loss Reduction Project
SUGD-Lot 3, Construction of new 100/10 kV substation “Temurmalik” and related connection from existing AC substation