20.12.2022
Tajikistan: Wholesale Metering and Transmission Reinforcement Project
Prepared by Implementing Agency: State Establishment «Project Management Unit for Electro-Energy Sector» (SE «PMUES») for the Executing Agency Open Stock Holding Company «Barqi Tojik» (BT), and the Asian Development Bank.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
01.11.2022
Semi-Annual Social Safeguards Monitoring Report
This bi-annual social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area
19.10.2022
Republic of Tajikistan: Wholesale Metering and Transmission Reinforcement Project
Prepared by Implementing Agency: State Establishment «Project Management Unit for Electro-Energy Sector» (SE «PMUES») with support of Mercados Aries International -Project Implementation Consultant for the Executing Agency Open Stock Holding Company «Barqi Tojik»(BT), and the Asian Development Bank.
This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
10.08.2022
Tajikistan: Wholesale Metering and Transmission Reinforcement Project
Prepared by Implementing Agency: State Establishment «Project Management Unit for
Electro-Energy Sector» (SE «PMUES») for the Executing Agency Open Stock Holding
Company «Barqi Tojik» (BT), and the Asian Development Bank.
This environmental monitoring report is a document of the borrower. The views expressed herein do not
necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary
in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or
reference to a particular territory or geographic area in this document, the Asian Development Bank
does not intend to make any judgments as to the legal or other status of any territory or area.
10.08.2022
Tajikistan: Reconnection to the Central Asian Power System Project
Prepared by Project Management Unit for Electro-Energy Sector for OJSHC “BarqiTojik” and the Asian Development Bank
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
23.06.2022
Tajikistan: Power Sector Development Program
Prepared by Implementing Agency: State Establishment «Project Management Unit for Electro-Energy Sector» (SE «PMUES») for the Executing Agency Open Stock Holding Company «Barqi Tojik» (BT), and the Asian Development Bank.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
14.06.2022
Tajikistan: Golovnaya 240 MW Hydropower Plant Rehabilitation Project Prepared
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
01.02.2022
Tajikistan: Wholesale Metering and Transmission Reinforcement Project
This environmental monitoring report is a document of the borrower. The views expressed herein do not
necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary
in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or
reference to a particular territory or geographic area in this document, the Asian Development Bank
does not intend to make any judgments as to the legal or other status of any territory or area.
01.02.2022
Tajikistan: Golovnaya 240 MW Hydropower Plant Rehabilitation Project
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area
01.02.2022
Tajikistan: Reconnection to the Central Asian Power System Project
Prepared by Project Management Unit for Electro-Energy Sector for OSHC Barqi Tojik and the
Asian Development Bank
This environmental monitoring report is a document of the borrower. The views expressed herein
do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may
be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation
of or reference to a particular territory or geographic area in this document, the Asian
Development Bank does not intend to make any judgments to the legal or other status of any
territory or area.
30.03.2022
Specific Procurement Notice Request for Bids
Specific Procurement Notice
Request for Bids
Employer: OSHC “Barqi Tojik”
Project: RURAL ELECTRIFICATION PROJECT
Contract title: Plant, Design, Supply, and Installation of Works for the Construction of the 10 kV Medium Voltage Power Lines and Associated LV Networks for Target Settlements in Khatlon Region
Country: Republic of Tajikistan
Grant No.: D-504 TJ
RFB No: BT/C/01
Issued on: 30.03.2022
18.02.2022
Contract Award Notice
Contract No.TJ NHPP CS 17: Consulting Services for Preparation of Emergency Preparedness Plan for Vakhsh Cascade
Project Name: Nurek Hydropower Rehabilitation Project, Phase 1
14.12.2021
Tajikistan: Regional Power Transmission Project
I. PROJECT DESCRIPTION
1. Tajikistan has made great strides in developing its power supply system since its
independence in 1991. However, the country’s power sector suffers from incomplete policies
and timid sector reforms, multiple structural weaknesses, and insufficiencies in sector core
functions (i.e., generation, transmission, and distribution) as well as inefficient consumption
by households, businesses, and government consumers.1 This is compounded by a
ballooning debt crisis that has become unsustainable. The main contributors to this crisis are
underpricing and nonpayment, high power system losses, aged and obsolete metering and
billing systems, weakness in financial management, insufficient cash flow, high debt service
obligations, large foreign exchange losses on grants and loans, lack of accountability, little
transparency, and poor sector governance.
23.09.2021
Community Support Project CASA-1000
Supply and installation contract for village electricity in Sogd, Khatlon, RRS Regions & Vorukh and Chorkuh –Village electricity supply improvements in the corridor of impact,
Subcomponent 1A
02.09.2021
Environmental and Social Impact Assessment (ESIA)
Environmental and Social Impact Assessment (ESIA)
of the subcomponent 1b - construction of a new 110/10 kV Isfara-1 substation with the associated construction of a 10-0.4 kV distribution network for power supply to the projected settlement
06.08.2021
Resettlement Action Plan
Resettlement Action Plan. Section: 66 kV electrode line and 220kV HVAC Transmission Line Route (T/L South segment)
15.07.2021
Request for bids Rural Electrification Project, Component 2: Provision of Electricity Service to Target Settlements in Khatlon Region
Plant, Design, Supply, and Installation of Works for the Construction of the 10 kV Medium Voltage Power Lines and Associated LV Networks for Target Settlements in Khatlon Region
05.07.2021
Invitation for tenders two stage
Supply and Installation of Billing and Metering Infrastructure and Rehabilitation of Distribution Lines 0.4 KV Single Circuit ABC in the Cities of Kulob and Bokhtar Including Surroundings
30.06.2021
Resettlement Action Plan Section: 500 HVAC Transmission Line Route (T/L Central segment)
Construction 500 KV Transmission Line South, Central and North Parts of Tajikistan
11.05.2021
Grant 0778-TAJ: Power Sector Development Program (extension of the term until 15.06.2021)
G2 - Procurement of Advanced Metering infrastructure, Low-Voltage and Medium-Voltage Enhancement for Dushanbe, Buston, Dangara, Panjakent, Konibodom, Isfara and Istaravshan, plus Boundary Meters