18.11.2016
Request for Expression of Interest Consulting services
Open Stock Holding Company "Barqi Tojik" is state-owned national energy company of the Republic of Tajikistan, located in the capital of Tajikistan, Dushanbe. The main purpose of OSHC "Barqi Tojik" is generation, transmission, distribution and sale of electric and heat power primarily in the local market in Tajikistan. It deals with issues of Republican power stations and networks operation, the generation, transmission, distribution and realization of electric and heat energy in the state.
09.11.2016
Request for Expression of Interest Consulting services
Request for Expression of Interest Consulting services for support in identifying existing deficiencies in revenue, management and developing an action plan to address issues raised in audit reports.
31.10.2016
Wholesale Metering and Transmission Reinforcement Project
ADB Grant 0417-TAJ: Wholesale Metering and Transmission Reinforcement Project
Lot 1: “Replacement of electricity meters, replacement of several current transformers, replacement of several voltage transformers, Introduction of an advanced metering infrastructure and introduction of a settlement system”
Procurement Method: ADB Single-Stage, Two Envelope Bidding Procedure
31.10.2016
Rehabilitation Works for Generation Units of Golovnaya HPP
ADB Grant 0376-TAJ: Golovnaya 240 MW HPP Rehabilitation Project
Lot 1: Rehabilitation Works for Generation Units of Golovnaya HPP
Results of International Competitive Bidding for Plant Design, Supply and Install
Procurement Method: ADB Two Stage Bidding Process
24.10.2016
Qairokkum Hydropower Rehabilitation Project Phase II
The Open Stock Holding Company Barqi Tojik (BT) is a 100% state-owned vertically integrated power utility responsible for generation, transmission and distribution of electricity in Tajikistan. BT intends using loan proceeds from the European Bank for Reconstruction and Development (EBRD) and European Investment Bank (EIB) as well as potential funding from the Green Climate Fund (“GCF”) to finance Phase II of the priority rehabilitation program at the Qairokkum hydro power plant.
17.10.2016
Supply & Installation of Bi-Pole HVDC Converter Stations in Pakistan and Tajikistan associated with CASA 1000
1.0 This invitation for bids follows the general procurement notice for this project that appeared in Development Business No: P145054 of November 11th, 2013 on-line and Bank’s external website. This re-invitation is based on revised configuration scope/qualification requirements after cancellation of earlier bidding process based on previous IFB of October 24th 2014.
04.10.2016
NUREK HYDROPOWER REHABILITATION PROJECT – PHASE I
The Government of the Republic of Tajikistan has applied for financing from the World Bank toward the cost of the Phase I of Nurek Hydropower Rehabilitation Project, and it intends to apply part of the proceeds to payments for goods, works, related services and consulting services to be procured under this project.
28.09.2016
Sugd Energy Loss Reduction Project - Extension
Open Stock Holding Company Barqi Tojik (BT) intends using the proceeds of a loan from the European Bank for Reconstruction and Development [the Bank] for rehabilitation of low and medium voltage distribution networks in the Sugd region, construction of 2 new 110/10kV Substations, installation of electricity meters with ancillary equipment to allow demand side management, reduce distribution network losses and increase energy efficiency. The Project is to be cofinanced by European Investment Bank (EIB) complemented by a grant from EU /Investment Fund for Central Asia (IFCA).
02.06.2016
Golovnaya 240 MW Hydropower Plant Rehabilitation Project
The Open Joint Stock Holding Company “Barqi Tojik” (“the Employer”) invites sealed bids from eligible bidders for the construction and completion of Rehabilitation Works of Switchyards of Golovnaya Hydropower Plant (“the Facilities”).
01.04.2016
Request for Expression of Interest (Company Selection) Consulting Services for: Fixed Consultancy ESIA Service for OSHC Barqi Tojik
OSHC "Barqi Tojik" has received grant from the International Development for the Association for the preparation grant for Advisory support for the regional trade initiative project (TF 016252), and intends to apply part of the proceeds of this financing to the providing ESIA and EMP for the project CASA-1000 with a Consulting firm, which shall provide the consulting services for: Environmental Impact Assessment and Environmental Management Plan.
15.02.2016
Sugd Energy Loss Reduction Project
Extended project implementation unit consultancy services
25.12.2015
General procurement notice. Nurek hydropower rehabilitation project
The project will include the rehabilitation of nine (9) generating units, each with a capacity of about 330 MW, and associated Balance of Plant; dam safety related improvements, environmental and social sustainability; and project management services for design and supervision of the Project.
This request for expression of interest (EOI) for Project Management consultancy services for the Nurek Hydropower Plant Rehabilitation Project follows the need to have a Project Management Consultant that will supervise all works done by the contractors on behalf of the OSHC “Barqi Tojik”.
27.11.2015
CASA-1000
Open Stock Holding Power Company "Barki Tojik" has received grant from the International Development for the Association for the preparation grant for Advisory support for the regional trade initiative project (TF 016252), and intends to apply part of the proceeds of this financing to the providing ESIA and EMP for the project CASA-1000 with a Consulting firm, which shall provide the consulting services for: Environmental Impact Assessment and Environmental Management Plan.
25.11.2015
Wholesale Metering and Transmission Reinforcement Project.
The Republic of Tajikistan has received financing (grant) from the Asian Development Bank (ADB) towards the cost Wholesale Metering and Transmission Reinforcement Project.Parts of this financing will be used for payments under the contract for Replacement of electricity meters, replacement of several current transformers, replacement of several voltage transformers, introduction of an advanced metering infrastructure, and introduction of a settlement system.Bidding is open to all bidders from eligible source countries of the ADB.
05.11.2015
Qairokkum Hydropower Rehabilitation Project
Qairokkum Hydropower Rehabilitation Project. Consultant for the PIU
16.10.2015
Winter Energy Project
Supply of Office Equipment and Associated Supplies for PRG ELRP of OSHC Barqi Tojik
16.10.2015
Winter Energy Project
1C: Enterprise 8 ‘Accounting” in OSHC “Barqi Tojik” and its subsidiary companies and maintenance of existing automated accounting system “1C: Enterprise 8 “Accounting”
24.07.2015
Qairokkum Hydropower Rehabilitation Project
Barqi Tojik intends using the proceeds of a loan from the European Bank for Reconstruction and Development [the Bank] to rehabilitate the hydro-mechanical and electro-mechanical equipment of the existing Qairokkum hydro power plant under present and future climatic conditions and increase the existing installed capacity from 126MW to 174MW by installing turbines with greater rated capacity.
In the frame of Project Preparation Advance for Winter Energy Project which will be provided by the International Development Association, OSHC "Barqi Tojik" intends to use part of these funds for the contract to supply of office equipment and associated supplies for PRG ELRP BT.